In 2019, Cando Rail contracted us to develop the Sturgeon Rail Terminal in Fort Saskatchewan. Throughout the course of the project, we were able to complete the grading of the railyard covering 302 acres of land; install 11,000 meters of drainage pipe; place 190,000 tonnes of sub ballast; install a concrete control structure; install a gabion drop structure all the while completing two tie ins to active CN Rail tracks. Overall, the project was a great illustration of the teamwork between the owner, project consultants and our team as many solutions were provided to be able to deliver the project on time and under budget.