CN Track Twinning

Projects / Infrastructure / CN Track Twinning

Spruce Grove
AB

CN took on over 10 track twinning projects for 2018 and Broda successfully completed 2 of them. The Spruce Grove Project was the most technically challenging out of all CN’s projects that year – it was the longest twinning, traversed sections of extreme terrain, and went through the middle of two cities and a very influential county.

PROJECT HIGHLIGHTS

– 20 km of tree clearing and mulching
– Over 300,000 m3 of material moved
– Over 100,000 tons of granular material installed
– 210 meters of MSE wall completed
– Over 300 lock blocks installed to stabilize backslopes
– Over 20 meters of culver extensions installed
– Over 300 meters of underground storm pipe installed
– 20-30 trains per day on the active track traveling up to 75 mph
– 45-60 trains per day on the twinned tracks

Message Us

Location

4271 5 Ave E,
Prince Albert, SK
S6V 7V6
Canada

Social

facebook
twitter
linkedin
instagram

© 2025 · Broda Construction. All Rights Reserved. Website by OmniOnline · Sitemap · Login