Located 34 km north of Quesnel BC is the Ahbau Quarry owned by CN Rail. In December 2020, Broda was contracted to manufacture 80,000 m3 of rip rap for slope stabilization along the Fraser River north of Prince George BC. Since the quarry was inactive for several years, our attention was focused on site cleanup until our drilling program could commence. With an onslaught of mild temperatures and excess snow, our challenges were mostly weather related. Fortunately, our crew were familiar with these conditions and able to push through to produce quality rip rap to meet the desired quantities for the client.